Consultancy & Engineering Services
Consultancy & Engineering Services

Consultancy & Engineering Services

Essel Mining & Industries Ltd, Odisha

Essel Mining & Industries Ltd., an Aditya Birla Group Company wanted to expand their iron ore mines. Binani Infratech Ltd. did the Engineering consultancy and feasibility study for 14 Km long mechanized iron-ore conveying system of 7.5 MTPA capacity at Kasia Mines, Barbil. The scheme involved selection of best route and sizing of pipe conveyor system & other equipment / facilities for pollution free transportation of iron ore. The job was completed in November 2012. 

Essel Mining & Industries Ltd, Odisha

Essel Mining & Industries Ltd., an Aditya Birla Group Company has placed repeat order for engineering consultancy. They have placed order with us for preparation of basic engineering for 4 MTPA Central Crushing & Screening Plant including conveyors, connecting equipment, rapid loading / wagon loading at railway siding at Jilling Langlota Iron & Manganese Mines. Draft report has been submitted and we are expecting clearance from customer for submission of final document.

Binani Cement Factory (Mauritius) Ltd.

Binani Group has plans to set up a cement grinding unit at Port Louis, Mauritius. The Project Design and Engineering for setting up of 1 MTPA Grinding Unit in Mauritius was awarded to us. This project has been completed.

Binani Cement Ltd.

Pre planning services, pre-engineering & consultancy for setting up of 1 MTPA Cement Grinding Unit in Odisha was awarded to us. This job has been completed.

Binani Cement Ltd.

We were entrusted with feasibility study, detailed project report, engineering and consultancy for setting up of 55 MW Power Plant at Nimbri, Rajasthan. This job has been completed.

Goa Glass Fibre  Ltd.

3B is a reputed Fibre Glass manufacturer in Europe and has been acquired by Binani Group. 3B has plans for setting up of a Fibre Glass Factory in India with European Standard.

We were entrusted with the responsibility for selection of a suitable site for setting up a Fibre Glass factory in India. The site was selected keeping in view availability of raw materials, water, power, logistics and related infrastructural facilities required for commercial operation. The report has been submitted. 

Binani Cement Ltd.

Binani Group has plans for setting up a cement factory in Fujairah in UAE. We have been entrusted with preparation of project report, engineering and consultancy for setting up of 2 MTPA Clinkerization Unit at Fujairah in UAE. This project is under execution.

Binani Cement Ltd.

Binani Cement has a plant of capacity 6 MTPA (Unit # 1 & 2) at Sirohi, Rajasthan and is now planning for further expansion. We have been entrusted with preparation of project report, engineering and consultancy for the expansion project Unit # 3: Phase – 1 of 1 MTPA Clinkerization Plant (expandable to 2 MTPA). This project is under execution.